CLIENT: Fulton County School System SIZE: 19,600 SF COST: $2,400,000 LOCATION: Atlanta, GA The addition consists of nine Science labs, two student toilet rooms, a janitor’s room, mechanical/electrical rooms, two staff toilet rooms and five preparation and project rooms. The facility is approximately 19,600 square feet and operates on an average eight hours a day,
CLIENT: Dougherty County School System SIZE: 65,790 SF COST: $7,500,000 LOCATION: Albany, GA The Lamar Reese Elementary School consists of three classroom wings which independently service K-1, 2-3, and 4-5 grade levels. The three classroom wings are supported by a central core consisting of a computer lab, administration suite, media center, and art / music
CLIENT: Atlanta Public Schools SIZE: 228,028 SF COST: $14,500,000 LOCATION: Atlanta, GA Kennedy Middle School was designed in 1968 by John Portman. The original design featured open air atriums, open classroom plan and was unique in that the building houses both school related and community related functions. The renovation of the school consisted of changing
CLIENT: Georgia Southern SIZE: 100,000 SF COST: $8,300,000 LOCATION: Statesboro, GA This 2-story brick structure houses: a rock climbing wall, 5 racquetball courts, 1 full and a smaller gymnasiums, 1 basketball court and roller hockey; women and men’s locker rooms and showers; free weights and cardiovascular weight rooms; four-lane jogging track which borders the second
CLIENT: Albany Technical Institute SIZE: 34,000 SF COST: $3,437,700 LOCATION: Albany, GA The George M. Kirkland Building Features a conference center / meeting hall and other administrative areas. The building is a slab-on-grade, modified horse-shoe shaped facility. The two-story masonry building's second floor is actually tucked under the metal roof, giving the appearance of a
CLIENT: Albany Technical Institute SIZE: 28,000 SF COST: $3,400,000 LOCATION: Blakeley, GA The Early County Satellite Center is seated on a hill, on a heavily wooded site, enhancing visibility to approaching traffic and assisting in establishing the building as being the dominate fixture within its vicinity. The 28,000 s.f. building is a 1-story, slab-on-grade brick